The house is brand new. Do you still have to grind the floor?
Yes. Builder slabs carry a curing compound film that nothing bonds to, and a fresh trowel finish is too smooth for a coating to grip. Grinding is what makes it last.
New-construction garages, screened lanais, and pool decks from Julington Creek to the CR 210 corridor, installed by the owner. Gary's recent work is in St. Johns, and most of it is on slabs that were poured in the last few years.
St. Johns
Why New Slabs Still Need Prep
Most of St. Johns was built in the last fifteen years, so the slab under your garage is newer than most Gary works on. Newer isn't the same as ready. Builders spray curing compound on fresh concrete, and that film has to be ground off or nothing bonds to it. New slabs also hold more water for the first year or two, which is why the moisture test matters here as much as it does at the beach.
The upside of a newer slab: fewer cracks to repair, flatter floors, and a cleaner canvas for the flake blend. Once it's ground and tested, a St. Johns garage is one of the easier floors to make look like a showroom.
Straight Answer
Lanais and pool decks get polyaspartic, no debate, for the UV and the one-day install. Garages are a real choice. If you're moving in and the garage is empty anyway, epoxy over two days is the value pick. If the cars are already in there and you can't lose them for three days, polyaspartic gets you parking tomorrow. Gary quotes both at the visit.
Real Jobs · Zero Stock Photos
Gary's recent installs were in St. Johns and Jacksonville Beach. A few from the gallery:



The full set is in the gallery.
How It Goes
From your text to a floor you can park on.
Form, call, or text (904) 775-6247. Gary texts back within four business hours.
He drives to St. Johns, tests the slab for moisture, checks for curing compound, shows flake samples on your floor, and gives you a firm number.
Diamond grind, crack repair, base coat, flake broadcast, topcoat. One day for polyaspartic, two for epoxy.
Foot traffic in 24 hours. Cars in 24 to 72 hours depending on the system. Gary tells you the exact time when he packs up.
Straight Answers
What new-build homeowners ask before they book.
Yes. Builder slabs carry a curing compound film that nothing bonds to, and a fresh trowel finish is too smooth for a coating to grip. Grinding is what makes it last.
That's the best time. Empty garage, no cars to move, and it's cured before the moving truck shows up. Book the visit as soon as you have a closing date.
Yes. All of St. Johns and the CR 210 corridor, plus Nocatee, World Golf Village, and St. Augustine.
You pick the blend from physical samples on your own slab at the quote, not from a screen. Grey-and-cream, blue-grey, silver metallic, and more. Gary brings the samples.
About 24 hours on polyaspartic. 48 to 72 hours on epoxy. Gary gives you the exact time when he finishes.
Not with the anti-slip additive in the topcoat, which Gary recommends on every lanai and pool deck.
Nearby
Nocatee, World Golf Village, St. Augustine, Jacksonville, and Jacksonville Beach, where Gary's other recent jobs are. All four counties on the service area page.
/ St. Johns
Free on-site quote. Moisture-tested. Owner-installed.